Visitwallpapers.com


Login
Gallery : www.visitwallpapers.com Keyword Album: snow Trains_187
Advanced Search
View Slideshow

Keyword Album: snow

1. Kristen_Ste... ... 141. tree_292 142. kinkakuji_18 143. kfp4_67 144. Trains_187 145. kfp5_05 146. Other_Comic... 147. kfp5_01 ... 701. Sunset_1543
View Slideshow

Keyword Album: snow

1. Kristen_Ste... ... 141. tree_292 142. kinkakuji_18 143. kfp4_67 144. Trains_187 145. kfp5_05 146. Other_Comic... 147. kfp5_01 ... 701. Sunset_1543

Trains_187

Qinghai-Tibet Train

The Qinghai–Tibet railway or Qingzang railway is a high-elevation railway that connects Xining, Qinghai Province, to Lhasa, Tibet Autonomous Region of China.

The length of the railway is 1,956 km (1,215 mi). Construction of the 815 km (506 mi) section between Xining and Golmud was completed by 1984. The 1,142 km (710 mi) section between Golmud and Lhasa was inaugurated on 1 July 2006, by CPC General Secretary Hu Jintao: the first two-passenger trains were "Qing 1" (Q1) from Golmud to Lhasa, and "Zang 2" (J2) from Lhasa to Beijing. This railway is the first that connects the Tibet Autonomous Region to any other provinces. Tibet, due to its elevation and terrain, is the last provincial level region in China to have a railway. Testing of the line and equipment started on 1 May 2006. Passenger trains run from Beijing, Chengdu, Chongqing, Guangzhou, Shanghai, Xining, and Lanzhou and can carry between 800 and 1,000 passengers during peak season.

Date: 08/20/2020
Size:
Full size: 2300x1542
nextkfp5_05lastSunset_1543
Kristen_Stewart_23first kfp4_67previous
Trains_187
nextkfp5_05lastSunset_1543
Kristen_Stewart_23first kfp4_67previous